Plasma
RenewableEnergy
The One-Stop Renewable Energy Solution Provider
How can PRE be of help to you?
Subject
Enter your comments in the space provided below:
Alternatively, if you have an idea for a project or would like for us to conduct a preliminary evaluation of a project for your industrial facility/in your area, please provide the following information as best possible, and wherever applicable. The more information we have of your scenario, the better we would be able to advise and conceptualize a PGV project for you.
1. Quantity of waste available. Quantities of different types (as per no. 2 below)
2. Types of waste; e.g. MSW, Industrial, Medical, Biomass, Sludge, etc.
3. Waste composition & characteristics; e.g. moisture content, calorific value,
proximate/elemental analysis of waste (sample sheet attached), etc.
Waste Data Sheet
Proximate Analysis
Low End
High End
Water
%
Volatiles
Ashes
Fixed Carbon
TOTAL
100%
Ultimate Analysis
H2O
CxHy (O, C, N2, S)
C
Fe2O3
K2O
Al2O3
SiO2
Na2O
NiO
P2O5
ZnO
PbO
CdO
Cr2O3
CuO
Elemental Analysis
Carbon
Hydrogen
Oxygen
Nitrogen
Chlorine
Sulfur
TOTAL COMBUSTIBLES
Heating Value
Low
High
On a Calculated Basis
kCal/kg
kJ/kg
On a Reported Basis
a. What are the packaging sizes/dimensions/weight/average bulk density?
b. Any special handling requirements?
c. Current method of disposal: How is it disposed off? i.e. landfilled/ incinerated/
combusted in boiler, etc.?
d. Amount of fossil fuel used in disposal process? i.e. diesel, gas, etc.
e. Any ash disposal? How and where is it disposed?
f. Current cost of disposal? Tipping Fees? Different fees for different types of waste?
4. Power Generation Requirements: How much Power / Steam / Hot water is used/
required for your Industry/Area/Local Grid/etc.?
a. For Power: Internal usage requirement? For Export / Sale target?
b. For Steam: Flow Rate? Volume? Temperature?
c. For Hot Water: Volume? Temperature?
d. Current method of generation for each type? i.e. gas/steam turbines, boilers, etc.
(type, make, model, capacity, etc.)
e. Is power/energy internally generated or purchased from external sources?
f. If internally generated, amount of diesel/electricity used for generation?
g. Current costs of generation (either generated internally or purchased, or both)?
5. Site for PGV facility: Is there a site available?
a. Size and characteristics of site.
b. Current infrastructure?
c. How close is it to the renewable fuel (RF) off-take facility? i.e. if the RF is to be
used to fuel boilers/laundry facilities/gas and/or steam turbines, etc.
6. Your plans: Are you looking at PRE to provide a Turnkey / BOO / BOOT / JV with PRE?
Please tell us how to get in touch with you: